: Specific chapters for wiring, fittings, appliances, switchgear, and cables. Administrative & Technical Notes Royalty Charges
Before diving into the DSR details, it is important to understand the scale of the Maharashtra PWD’s responsibilities. The department is responsible for:
: Acts as a reference check for government auditors to flag over-invoicing or unnatural variance in construction costs.
These rates excluded taxes. Contractors added GST @ 18% or applicable VAT/CST (for old stocks) as per transition rules. pwd dsr 2017-18 maharashtra
: It ensures transparency by preventing arbitrary pricing in public tenders.
One representative item from the DSR is (Page No. 197), which covered:
The 2017-18 DSR is significant because it accounted for the introduction of Goods and Services Tax (GST) and varying regional costs. These rates excluded taxes
The Public Works Department (PWD) of Maharashtra plays a pivotal role in the state’s infrastructure development, and its District Schedule of Rates (DSR) is the backbone of every government construction project. The is a crucial financial and technical document that standardized the costing of materials, labor, and machinery across the state’s engineering projects during the fiscal year 2017-18. This article provides a detailed exploration of what the DSR is, why it matters, what rates and items it covered, how it was used in tendering, and the broader fiscal context of the Maharashtra PWD in 2017-18.
The is a critical document published by the Public Works Department (PWD) , Government of Maharashtra. It serves as the official rate analysis for various construction items, materials, and labor across all districts of the state.
Detailed rates for asphalt, concrete road surfaces, deep foundations, and bridge-specific items. One representative item from the DSR is (Page No
serves as the primary benchmark for estimating the cost of public construction projects, such as roads, bridges, and buildings. This schedule was officially applicable from September 22, 2017 , for all districts in Maharashtra. Overview of the 2017-18 DSR
These rates did not include GST. Circular No. PWD-2017/C.R. 88/B-1, dated 20th July 2017, clarified that GST would be paid on the actual invoice bill within the contract, as per the new tax regime.