Proper installation is critical for the sensor to provide accurate readings without interference from artificial light sources.

Use the override button to switch between permanent ON, Permanent OFF, or Automatic operation. 5. Troubleshooting Common Issues

Relocate the photoelectric cell away from the direct beam path of the connected lighting fixtures.

Lights will turn on during overcast days or early dusk (up to 2000 Lux).

Includes automatic winter/summer time changeover and a holiday schedule mode. Basic Programming Steps

Access the LIGHT menu to adjust the brightness threshold (lux) and set switching delays to prevent flickering from transient light (e.g., car headlights).

The IC2000 P is discontinued. Direct replacements from Schneider Electric include:

Allows for temporary program suspension (1-45 days). 2. Technical Specifications (IC 2000 P - 15286) Operating Voltage: 230 V AC Switching Output: Relay, NO (normally open) Switching Capacity: ) at 230 V AC

The IC 2000 P interface consists of a screen and buttons for setting the time, day, lux level, and program, similar to the IC 2000P+ manual (CCT15483) . 4.1 Initial Setup

No. Most likely it is an auxiliary contact or control relay. A standard Merlin Gerin circuit breaker would have a thermal-magnetic trip curve (e.g., C, D, or B curve). The "Ic" designation stands for Interface and Control .

Use the "Test" button to verify the relay clicks and the circuit triggers correctly. docs.rs-online.com For the full detailed manual, you can view the Acti 9- IC2000P+ Operating Instructions provided by Schneider Electric , the successor to the Merlin Gerin brand. Schneider Electric or a specific programming sequence for the 7-day schedule? light sensitive switches IC200, IC2000, IC2000P - RS Online 5 Jul 2001 —