Advantest 93k Tester Manual [new]
SmarTest is the heart of the 93K. This manual explains:
The capabilities of a 93k system depend heavily on the specific instrument cards loaded into its cages.
Emily was initially overwhelmed by the manual's size and complexity. However, with John's guidance and encouragement, she began to understand the tester's operation and learned to use the manual as a resource. She soon became proficient in using the Advantest 93K tester and was able to contribute to the team's efforts.
When opening the manual to build a test program, prioritize these four core pillars: 1. The Pin Configuration (Pinconfig) advantest 93k tester manual
Mount the correct Device Interface Board (DIB) onto the test head.
Procedures for emergency power off (EPO) and handling high-voltage pins. Hardware Reference and Calibration Guide This volume focuses on maintenance and hardware validation.
A graphical or programmatic sequence determining the exact order of execution for functional, parametric, and continuous tests. SmarTest is the heart of the 93K
Be cautious of third-party PDF sites. Older (pre-2010) manuals may refer to obsolete SmarTest versions (e.g., v5.x vs v7.x) and have incorrect timing calibration steps.
The 93k uses a hierarchical structure to execute tests sequentially. The Smate Flow Tool dictates how the tester responds to passes or failures. Test Suites
When SmarTest outputs an error code (e.g., severe hardware timeout errors), look up that exact alphanumeric string in the software reference manual index. However, with John's guidance and encouragement, she began
A dedicated Linux computer that runs the SmarTest operating system, controlling the tester via a high-speed fiber-optic link. 2. Software Environments: SmarTest 7 vs. SmarTest 8
In SmarTest 7, you override the run() function of a standard test method class: