Thyssenkrupp Levant Stair Lift Installation Manual Full [portable]

Connect the power cable leads to the copper charging contacts. Ensure positive (+) and negative (-) terminals match the wiring schematic.

Ensure a full survey of the staircase is conducted to measure the exact length needed and check for obstacles.

Drive the heavy-duty wood screws (or concrete anchors, if applicable) through the brackets and into the treads until the rail is completely rigid. System Configuration and Handset Pairing Battery Activation thyssenkrupp levant stair lift installation manual full

If you are a homeowner attempting a self-install, this manual will guide you, but you will need patience and a solid understanding of electrical safety. For a professional, the manual is an efficient, standard operating procedure that ensures a safe and smooth ride.

: Drive the lift in one direction and gently press the safety edges on the footrest and chassis. The lift must stop instantly . Repeat this test for all directional safety pans. Connect the power cable leads to the copper

Space required at the bottom landing for the rail to extend past the bottom step. 2. Tools and Equipment Required

Clear the staircase of all obstructions and measure the rail path to ensure the track will extend properly beyond the bottom step to the floor. 2. Rail Installation Drive the heavy-duty wood screws (or concrete anchors,

Use a spirit level to ensure the rail is straight and matches the incline angle of the staircase.